CMRP Formula Sheet: Key Metrics by Pillar, With Examples
You can't bring a formula sheet into the CMRP exam. SMRPCO's Candidate Handbook describes it as a closed-book exam: no notes or reference materials (unless SMRPCO has authorized an accommodation), with an on-screen calculator and no outside calculators. So whatever formulas you need, you have to carry in your head.
The good news: most of the math is a small set of ratios, mostly SMRP's numbered maintenance and reliability metrics, and nearly all of them are "this bucket of hours (or dollars) divided by that bucket." People rarely miss these because the arithmetic is hard. They miss them because they pick the wrong denominator.
Below is our formula sheet, grouped by the five CMRP pillars, plus a worked example that runs one plant's month through the key formulas. For the full set of numbered SMRP metrics, each with its equation, variable key, and edition notes, see our SMRP formulas page.
How to use this sheet
- Read the denominator first. Uptime and availability have the same numerator and different denominators. Rework is divided by all maintenance hours, not just corrective hours.
- Follow the question. Where SMRP's Best Practices (7th edition) is inconsistent, we say so below. On the exam, use the definition the question gives you.
The time model (Pillars 2 and 3)
These buckets feed OEE, TEEP, availability, and uptime.
| Symbol | Bucket | Formula or meaning |
|---|---|---|
| T_a | Total available time | Every hour in the period (720 h in a 30-day month) |
| T_i | Idle time | Hours the asset wasn't needed: no demand, no feedstock, no raw materials, administrative shutdown. Not downtime. |
| T_d | Total downtime | Scheduled downtime + unscheduled downtime |
| T_o | Uptime | T_a − (T_i + T_d) |
| T_u | Utilization time | T_a − T_i (the hours the asset was scheduled) |
Pillar 1: Business and Management
| Metric | Formula |
|---|---|
| Maintenance cost as % of RAV | (Total maintenance cost ÷ Replacement asset value) × 100 |
| Stocked MRO inventory as % of RAV | (Stocked MRO inventory value ÷ RAV) × 100 |
| RAV per craft-wage employee | RAV ÷ Craft-wage headcount |
| Maintenance unit cost | Total maintenance cost ÷ Units produced |
RAV means replacement asset value: what it would cost to replace the asset today. It isn't book value or insured value.
Pillar 2: Manufacturing Process Reliability
| Metric | Formula |
|---|---|
| Availability | A = T_o ÷ (T_a − T_i) |
| Uptime % | (T_o ÷ T_a) × 100 |
| Utilization % | (T_u ÷ T_a) × 100 |
| Performance | P = Actual rate ÷ Best rate, or Best cycle time ÷ Actual cycle time |
| Quality rate | Q = Good units ÷ Total units |
| OEE | A × P × Q |
| TEEP | U × A × P × Q |
Two notes. The 7th edition calculates availability net of idle time, so a line with no weekend orders isn't "unavailable." And its OEE metric box appears to print the cycle-time ratio upside down (actual ÷ best). The OEE guideline in the same book uses best ÷ actual, which keeps performance at or below 100%, and so do we. Our OEE formula page covers this in detail.
Pillar 3: Equipment Reliability
| Metric | Formula | Applies to |
|---|---|---|
| MTBF | Operating time ÷ Number of failures | Repairable items |
| MTTF | Operating time to failure ÷ Number of items run to failure | Non-repairable items |
| MTTR | Total repair time ÷ Number of repairs | Repair work |
| MDT | Total downtime ÷ Number of downtime events | The whole stop, including waits |
| MTBM | Operating time ÷ Number of maintenance events (PM and corrective) | All maintenance |
| Inherent availability | A_i = MTBF ÷ (MTBF + MTTR) | Corrective repair time only |
| Operational availability | A_o = MTBM ÷ (MTBM + MDT) | All downtime, including logistics |
| Failure rate | λ = 1 ÷ MTBF (constant failure rate) | Random failures |
| Reliability | R(t) = e^(−λt) | Constant failure rate only |
MTTR is the one to watch. We teach MTTR as hands-on repair time and MDT as the whole stop. SMRP's 7th edition isn't consistent here: its mean-downtime metric and availability guideline treat MTTR as pure repair time, while its MTTR metric starts the clock when the asset stops and includes administrative and logistic delay. Use the definition the question gives. Our MTBF and MTTR pages cover the full availability family.
The reliability formula is standard exponential-model math, not an SMRP metric. One result worth knowing: at t = MTBF, R = e^(−1) ≈ 0.37, so a constant-failure-rate asset has only about a 37% chance of reaching its MTBF without failing.
Where are your gaps? A formula sheet only helps if you know which pillars need the work. Our free 30-question CMRP diagnostic takes about 45 minutes and gives you a score for each of the five pillars.
Pillar 4: Organization and Leadership
| Metric | Formula |
|---|---|
| Rework % | (Corrective hours identified as rework ÷ Total maintenance labor hours) × 100 |
| Training cost per employee | Total formal training cost ÷ Number of internal maintenance employees |
| Training ROI % | [(Business benefits − Training cost) ÷ Training cost] × 100 |
Pillar 5: Work Management
| Metric | Formula |
|---|---|
| Planned work % | (Planned hours executed ÷ Total maintenance labor hours) × 100 |
| Reactive work % | (Hours of work that broke into the weekly schedule ÷ Total maintenance labor hours) × 100 |
| Schedule compliance (hours) % | (Scheduled work performed ÷ Total time available to schedule) × 100 |
| PM & PdM compliance | PM/PdM work orders completed by the due date ÷ PM/PdM work orders due |
| Planned backlog (weeks) | (Planned work + Ready work) ÷ Weekly crew capacity |
| Ready backlog (weeks) | Ready work ÷ Weekly crew capacity |
| Wrench time % | (Wrench-time observations ÷ Total observations) × 100 |
| Stores inventory turns | Value of stock purchased in the period ÷ Value of stock on hand |
Reactive and unplanned aren't the same thing. Reactive work broke into the schedule. Unplanned work never had a job plan.
Worked example: one plant, one month
A packaging line and its maintenance crew over a 30-day month.
Variable key
| Variable | Meaning | Value |
|---|---|---|
| T_a | Total available time | 720 h |
| T_i | Idle time (no orders) | 120 h |
| T_sch | Scheduled downtime (PM, changeovers) | 24 h |
| T_un | Unscheduled downtime (4 failures) | 36 h |
| T_r | Hands-on repair time for the 4 failures | 14 h |
| H_a | Crew hours available to schedule per week (8 techs × 40 h) | 320 h |
| H_s | Scheduled work performed in a typical week | 248 h |
| W_p | Planned work not yet ready (awaiting parts) | 900 h |
| W_r | Ready work | 700 h |
| C | Weekly crew capacity (no overtime or absences) | 320 h |
| O_w, O_t | Work-sampling observations: wrench time, total | 128, 400 |
| H_rw, H_m | Rework hours, total maintenance labor hours for the month | 18 h, 1,280 h |
Step 1: Downtime and uptime. T_d = 24 + 36 = 60 h T_o = 720 − (120 + 60) = 540 h
Step 2: Availability vs uptime %. A = 540 ÷ (720 − 120) = 540 ÷ 600 = 90.0% Uptime % = 540 ÷ 720 = 75.0% Same numerator, different denominators, a 15-point gap. This is the most common trap on the sheet.
Step 3: MTBF, MTTR, and MDT. Assume the line ran during all 540 uptime hours. MTBF = 540 ÷ 4 = 135 h MTTR = 14 ÷ 4 = 3.5 h MDT (failure events only) = 36 ÷ 4 = 9.0 h The crew spends 3.5 hours fixing each failure, but the line is down 9. The other 5.5 hours are waiting: a parts and planning problem, not a skills problem.
Step 4: Schedule compliance. SC = 248 ÷ 320 = 77.5%
Step 5: Backlog. Planned backlog = (900 + 700) ÷ 320 = 5.0 weeks Ready backlog = 700 ÷ 320 = 2.2 weeks
Step 6: Wrench time and rework. Wrench time = 128 ÷ 400 = 32.0% Rework = 18 ÷ 1,280 = 1.4%
Dividing rework by corrective hours only would give a bigger, wrong number.
Five denominator traps
- Availability vs uptime %: T_a − T_i vs T_a.
- Calendar hours in MTBF: use operating time.
- Planned vs ready backlog: only planned backlog includes work waiting on parts.
- Rework: divide by total maintenance labor hours, not corrective hours.
- Cycle time: if performance tops 100%, you inverted it.
A few formulas outside SMRP's metric set
CMRP prep also uses general formulas that aren't numbered SMRP metrics:
| Formula | Expression |
|---|---|
| Risk priority number (FMEA) | RPN = Severity × Occurrence × Detection, each usually rated 1–10 |
| Simple payback | Initial investment ÷ Annual net savings |
| Net present value | NPV = Σ [CF_t ÷ (1 + r)^t] − Initial investment |
Variable key: CF_t = net cash flow in year t; r = discount rate; t = year number.
Some sources score RPN from criticality and probability only, so read the question for which factors it uses. Automotive FMEA practice has also moved away from RPN: the 2019 AIAG & VDA FMEA Handbook replaced it with an Action Priority table.
Turning the sheet into recall
Reading a formula sheet won't get you through a closed-book exam. Write one pillar's formulas from memory each day and check them against the sheet. Practice on questions with distractors, not just flashcards. And keep an error log: most misses will be denominators.
The CMRP exam guide covers format and how to prepare, and How hard is the CMRP exam? walks through pacing 110 questions in 2.5 hours.
Our CMRP Practice Exams pack has 600 original practice questions: 3 full-length 110-question practice exams, a diagnostic, and a practice quiz for each of the five pillars, with explanations for every answer.
Find out where you stand
Before you memorize all of this, see which pillars need the most work. The free 30-question CMRP diagnostic is split 6/5/6/5/8 across the five pillars and takes about 45 minutes. You'll get a score for each pillar, so you know where to start.
Sources: SMRPCO Candidate Handbook (posted Oct 2026: https://smrp.org/wp-content/uploads/2026/10/SMRP-Candidate-Handbook.pdf), for the closed-book format, on-screen calculator, and 110 questions in 2.5 hours. SMRP Best Practices, 7th edition, for the metric formulas (1.3–1.5, 2.1.1–2.5, 3.5.1–3.5.5, 4.1, 4.2.1, 4.2.3, 5.3.1, 5.4.1, 5.4.3, 5.4.8, 5.4.9, 5.4.14, 5.5.31, 5.6.1), Guideline 2.0 (OEE), and Guideline 6.0 (availability). The book is inconsistent on MTTR and on the cycle-time performance ratio, as noted above. NIST/SEMATECH e-Handbook of Statistical Methods, section 8.1.6.1, for the exponential reliability formulas. AIAG & VDA FMEA Handbook (2019) for the change from RPN to Action Priority. Payback and NPV are standard engineering-economics definitions. Worked-example figures are invented for illustration.